Schneider Electric K series Manual do Utilizador Página 18

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 17
PM1000 Series Power Meters PLSED309039EN
Chapter 2 Quick Start Guide 08/2010
18
© 2010 Schneider Electric. All rights reserved.
1. Connect auxiliary supply (control Power) 44 277 VAC/DC to terminals 12
and 13 in order to power ON the power meter.
Keep pressed for two seconds, while powering up the power meter.
The power meter directly enters into PROG menu setup and displays
EDIT A.PRI 100.0.
Program the following setup parameters for accurate readings:
A.pri, A.sec: Set these values to match your CT primary and
secondary values. For example, if your CT Ratio is 200:5, set A.pri =
200.0 and A.sec = 5.000.
V.pri, V.sec
Set these values to match the input voltage VLL of circuit, if the
input voltage < 480 VAC LL. For example, if input voltage = 300
VAC LL, set V.pri = 300.0 and V.sec = 300.0.
Use potential transformer (PT/VT), if the input voltage > 480 VAC
LL. Set the V.pri and V.sec values to match the primary and
secondary of the PT(VT) respectively. For example, if PT(VT) ratio
is 11 kV: 110, set V.pri = 11.00 k and V.sec = 110.0.
Select one of the following systems according to your wiring
configuration:
SYS: DLTA for 3-phase 3-wire system
SYS: WYE/Star for 3-phase 4-wire system
SYS: 2-phase for 2-phase 3-wire system
SYS: single-phase for single-phase 2-wire system
2. Connect the current transformers (CTs).
3. Connect the voltage inputs. Use PT(VT), if voltage exceeds 480 VAC LL.
4. RS 485 terminals (PM1200)
CT1
CT2
CT3
1, 2
3, 4
5, 6
PT1
PT2
PT3
Neutral
8
9
10
11
+ve
-ve
7
14
Vista de página 17