Schneider Electric FX 3NET Guia do Utilizador Página 26

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 64
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 25
Planning Instruction 66571758GB0 Fire Detection 26
6.4.4 Control group use for delayed alarm
Control groups A and B can be used together with the DAPX alarm panel for a delayed alarm according to the
Swedish standard.
The “delayed alarm” functional principle has been described in the following diagram.
Schneider Electric Pelco Finland Oy
Kalkkipellontie 6, 02650 Espoo, Finland Telephone: +358 10 446 511 Fax: +358 10 446 5103 www.pelco.com/nordic
Document Number 66571758GB0 49 2011
© 2009 Schneider Electric. All rights reserved.
Detector
Call point Detector
Delay T1<60s
Alarm transmission
delay
Delayed
function
ON
Delay function configurated Delay function not configurated
Fire detection
Local alarm
Acknowledge
during T1
Yes
No
No
No
Yes
Yes
Yes
No
Delay T1<600s
Alarm transmission
additional delay
Call point
Check
during T2
More help
needed
Reset
Alarm transmission
Note!
More detailed information is found in the WinFMPX and WinFX3Net configuration software instructions.
Note!
A typical application definition is T1 = 60s and T2 = 300s. The total maximum T1 + T2 = 600s.
Note!
The use of the function “delayed alarms” must always be agreed with local authorities.
Vista de página 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 63 64

Comentários a estes Manuais

Sem comentários